Mountains Recreation & Conservation Authority 2018-06-08T17:13:40+00:00

MOUNTAINS RECREATION & CONSERVATION AUTHORITY

TRAIL REHABILITATION & DRAINAGE IMPROVEMENTS


The Mountains Recreation & Conservation Authority Trail Rehabilitation & Drainage Improvements project is designed to repair the eroded, multi-purpose trail and control the flow of water for future storm events. The project is located in the Hollywood Hills off the famous Hollywood Boulevard. The trail grading includes benching of the trail in eroded areas, regrading an approved cross-fall slope, and installation of a swale with rip rap energy dissipaters. Drainage improvements includes the removal and replacement of 500 LF of asphalt berm and paving, the installation of a 24″ cast in place trench drain, rip rap dissipaters, slope repair for a detention basin, and a 6′ Redi-Rock block wall.

 

Project Start:          December 2014

Project End:            January 2015

Project Value:        $176,000